一本高清DVD在线播放|黄色一级电影网大胆国模|成人午夜视频非洲黄片|九色精品在线色五月女婷婷|日韩偷拍无码亚洲婷婷深深爱|欧美成人无码大片a毛片|欧美极品在线日韩新片区无码|嫩草官网avA片黄色片|国产日韩精品无码一二三区啤酒|性高潮久久久久久久久久久久

Good news: Wuxi Chemical Equipment Co., Ltd. Won the Bid for the 100MV Heat Transfer Oil Trough-type CSP

In December 2018, WCE won the Bid for theoil and salt heat exchanger, which is the key equipment of the 100MV heat transfer oil trough-type CSP project of CSNP in Wulate Middle Banner.

As the first batch of CSP demonstration projects of the National Energy Administration, it is also the trough-type CSP project with the largest installed capacity. Located in Wulate Middle Banner,Bayan Nur City, Inner Mongolia, it is the largest CSP project in China. The project has a total investment of about 2.9 billion Yuan and covers an area of about 7,300mu. There are 375 trough-type heat collection loops, where the 10-hour power generation and energy storage device, the steam power generation system and the steam turbine generator set are respectively selected one loop from them. The project has the expected power generating capacity of 350 million kilowatt-hours upon completion.

WCE attaches great importance to the project and will provide strong support in project design, equipment manufacturing and installation, to smoothly implement the project.



Wuxi Chemical Equipment Co., Ltd.  All rights reserved | SuICP No. 07004455   |  Technical support :WUXILIEBAOTEC